Double layer roll forming machine


The double-layer roll forming machine is composed of manual feeding device, leveling device, transmission device, forming roller table and host (including guiding platform), cutting device, hydraulic system, electric control system, finished product suppo

Main feature:
1. This unit is composed of  manual feeding device, leveling device, transmission device, forming roller table and main machine (including guiding platform), cutting device, hydraulic system, electric control system, finished product supporting device, etc.
2. Loading and uncoiling (put the steel coil into the inner support type opening frame and hold it tightly) The two-roll clamp feeding plate is calibrated and correctly imported, leveled, roll-formed, cut after forming, and the finished product is supported and discharged.
Technical parameter:

parameter

unit

structure

wall panel

raw materials

Galvanized steel

Feed width approx.

1000

effective width

760/900

thickness

0.4-0.6

yield strength

350

forming speed

10

forming unit

14

spindle material

45# high quality steel, quenched

shaft diameter

75

main motor power

10

hydraulic station power

5.5

cutting method

Hydraulic shear, cut off after forming


Company and service advantages:


1.The company workshop 40,000 square meters, has introduced the first-class multi-station machining center, CNC lathes, CNC milling machines and other high-precision processing equipment. Such as the value of 4.5 million yuan 3mx8m gantry machining center, and the value of 300 million yuan 2.5 mx12m gantry milling machine.


2.The company has a professional The Adjuster team, 24 hours to provide uninterrupted after-sales service.
(1) Installation and debugging
Equipment arrived at the customer workshop, according to the flat layout of our equipment. We will arrange experienced technicians to install, debug and test-produce the equipment, and make the equipment reach the rated production capacity of the production line.
(2) Training
Our company provides technical training for our customers. The training includes the structure and maintenance of the equipment, the control and operation of the equipment, experienced technicians will guide and establish the training program. After training, the buyer's technical personnel can master the operation and maintenance of the equipment, can adjust the process and deal with different failures.


3.After-sales quality problems within 2 hours to answer, if the telephone video guidance can not be solved, domestic 24 hours to send engineers to the site to solve the problem.


4. Factory direct sales price concessions, 40,000 square meters factory, 20 years of Export Enterprises, CE certification, patents more than 50 items.




Online Message

Reminder: In order to get in touch with you in time, please be sure to fill in your contact information and demand information completely. You can enter your demand, such as the model of the product, testing materials, and the budget range of the product; you can also use your mobile phone Call our account manager.
*Product name: *Your Name:
*E-mail: *Phone/Whatsapp:
*Company Name: *Product Category:
*Requirement:
     
Recommend